A COMPUTER ANALYSIS OF COAL PREPARATION PLANT ECONOMICS AND EQUIPMENT SELECTION

Special Research Report SR-114 In this research project a computer program has been developed for determining the capital and operating costs for coal preparation plants. The logic of the computer program is based upon a survey of existing preparation plants, operators, plant contractors, equipment manufac- tures, and consulting firms. This survey provided information on plant performance, order-of-magnitude costs, and costing procedures. Additionally, anextensive cost data file for the major capital equip- ment in coal preparation plants has been developed. Generalized and representative circuit flowsheets that portray real-world situations were analyzed. The preparation plant design was broken down into the following major circuits: 1. Raw coal storage 2. Raw coal crushing and handling 3. Coarse coal beneficiation 4. Intermediate coal beneficiation 5. Fine coal beneficiation 6. Clean coal storage 7. Unit train loading facilities 8. Refuse facilities and equipment 9. Thermal drying A preparation plant with one or all of the above circuits can be speci- fied for analysis with the program.

Files

Metadata

Work Title A COMPUTER ANALYSIS OF COAL PREPARATION PLANT ECONOMICS AND EQUIPMENT SELECTION
Access
Open Access
Creators
  1. Zigmond, R.D.
  2. Ramani, R.V.
  3. Frantz, R.L.
Keyword
  1. mineral
License Attribution-NonCommercial-NoDerivs 3.0 United States
Work Type Report
Acknowledgments
  1. Earth and Mineral Sciences College
Deposited July 27, 2016

Versions

Analytics

Collections

This resource is currently not in any collection.

Work History

Version 1
published

  • Created
  • Added 31z40kt14f_version1_SR-114.pdf
  • Added Creator Zigmond, R.D.
  • Added Creator Ramani, R.V.
  • Added Creator Frantz, R.L.
  • Published